Adjust image schedule

Using "Set as image" with a schedule to automatically create a new images at specified moments is very usefull for us. What we'd like to see is an option to change a schedule without the need to delete it first. 

We haven more than 20 scripted actions per image and when a scripted action must be added or removed the existing schedule can't be adjusted but needs to be deleted first. This means creating a screenshot first (or do adinistration in XLS or someting), than delete the current schedule and start clicking to rebuild the schedule with the required changes. This manual action is not very satisfying and there's always a risk of mistakes with actions like this.

3

Comments (3 comments)

Avatar
Brian Mock
(Edited )
1
Avatar
Michel van Eeuwen

Great, more reasons to bring this to the backlog ;-)

1
Avatar
Gido Veekens

Hi Michel van Eeuwen, Brian Mock. I've raised the priority for this request, so I expect we'll add the ability to change the scheduled Scripted Actions soon.

2

Please sign in to leave a comment.