Convert Nerdio Cost Estimate into Production

It'd be nice to have a wizard to create a Nerdio Environment from a Cost Estimate.
In the Wizard, we could select which Cost Estimate we want to use, Enter the customer's subscription information, enter the name(s) for the server(s) (If applicable), enter names for the Host Pool/Hosts, select the desired Infrastructure (or create infrastructure), and then Nerdio would do what it does best.

From there, we could assign a task to our Tier 1/Tier 2 techs to configure the image and test it out in the host pool.

2

Comments (1 comment)

Avatar
Jan Fredewess

That would be really great and is indeed asked a lot by prospects. I will leave an upvote.

1

Please sign in to leave a comment.